Package: aimPlot
Title: Create Pie Like Plot for Completeness
Version: 1.0.0
Authors@R: person("Yusman", "Kamaleri", email = "ybkamaleri@gmail.com", role = c("aut", "cre"))
Description: Create a pie like plot to visualise if the aim or several aims of a
             project is achieved or close to be achieved i.e the aim is achieved when the point is at the
             center of the pie plot. Imagine it's like a dartboard and the center means 100%
             completeness/achievement. Achievement can also be understood as 100%
             coverage. The standard distribution of completeness allocated in the pie plot
             is 50%, 80% and 100% completeness.
Depends: R (>= 3.2.0), utils
Imports: ggplot2 (>= 2.1.0)
Suggests: grid, gridExtra
License: GPL-2
LazyData: true
RoxygenNote: 5.0.1
NeedsCompilation: no
Packaged: 2016-04-22 07:54:42 UTC; yuskam
Author: Yusman Kamaleri [aut, cre]
Maintainer: Yusman Kamaleri <ybkamaleri@gmail.com>
Repository: CRAN
Date/Publication: 2016-04-22 13:09:49
Built: R 4.2.0; ; 2023-07-11 01:09:34 UTC; unix
